Inventory

Opportunities

Two ready apartments are available at 380,000 USD each. In Hibiscus Phase 2, 10 of 15 off-plan apartments are available, all at 350,000 USD. Ortensia and Lotus are coming soon; Phase 1 is sold out.

Passion Village pool at night
Valley Church Beach

Completed, fully furnished and equipped.

Ready apartments

Apartment 1

Apartment 1

Available

380,000 USD

  • 55 sqm + 30 sqm veranda
  • 1 bedroom, 2 bathrooms
  • Outdoor jacuzzi
  • Private garden 65 sqm
  • Fully furnished and equipped, A/C, 2 TVs
Request floor plans

Apartment 2

Apartment 2

Available

380,000 USD

  • 50 sqm + 18 sqm veranda
  • Pool-front, 2 bathrooms
  • Small garden with banana tree
  • Fully furnished and equipped, A/C, 2 TVs
Request floor plans
Render
Off-plan

Image: 3D render, not a photograph.

Hibiscus — Phase 2 (off-plan)

350,000 USD

  • 15 apartments, 10 available
  • Same price for all units: 350,000 USD
  • 2-bedroom options of 90–95 sqm
  • Gym and first-aid room
  • Construction start scheduled: April 2027
  • Expected completion: October 2028

Construction start and completion dates are scheduled by the developer and may change.

Hibiscus specification

  • 15 apartments over 3 levels (5 per level)
  • 10 units available
  • Gym and first-aid room
  • Construction start scheduled: April 2027
  • Expected completion: October 2028
  • Two-bedroom option on each level, in two layouts
Right side (green)
Spacesqm
Living room29
Bedroom 1 with bathroom21
Bedroom 2 with bathroom20
Rear balcony12
Front balcony13
Total95
Left side (orange)
Spacesqm
Living room36
Living-room balcony6
Bedroom 1 with bathroom21
Bedroom 2 with bathroom20
Bedroom 2 balcony7
Total90

Phase 2 pipeline

Coming soon

Ortensia

16 apartments

Coming soon

Lotus

8 apartments

Coming soon

Masterplan

Complex masterplan (indicative, source: developer)

Phase 1 — sold out

Phase 1 status

  1. TamarindCompletedSold out

    6 apartments, 1 villa

  2. FrangipaneCompletedSold out

    4 villas

  3. IrisCompletedSold out

    6 apartments

  4. BougainvilleaCompletedSold out

    5 apartments

  5. Restaurant & barCompletedSold out

    Restaurant and bar on site

  6. OrchidUnder constructionSold out

    12 suites

    Started: September 2025 · Expected completion: March 2027

  7. FlamboyantUnder constructionSold out

    10 suites

    Started: March 2026 · Expected completion: September 2027

  8. AmarillysUnder constructionSold out

    10 studios

    Started: October 2026 · Expected completion: February 2028

Source: developer brochure. Construction dates are set by the developer and may change.

The village

The village (illustrative images)

Sources